Timex Group


To reduce reliance on the electrical grid, Timex Group had 800 pole-mounted solar panels installed on the lawn adjacent to the entrance of their headquarters in Middlebury, CT. The installation, completed in 2009, is one of the largest ground-mounted solar panel arrays in the entire northeastern United States. This clean energy project was made possible by a grant from the Connecticut Clean Energy Fund.
Near the end of 2008, construction began on the second largest ground-mounted solar array in the northeastern United States. Timex Group USA’s 800-panel solar array was inaugurated on February 5, 2009 during a press event held at the company’s Middlebury, CT headquarters.
Size244 kW
Production356,799 kWh/year
PV modulesSunPower 305W (800 modules)
MountingGround
LocationMiddlebury, CT
Online since2009
System Offsets*AnnualLifetime
Pounds of CO2524,18413,554,600
Miles driven564,90414,122,600
Trees planted6,309517,725

 

*Calculations based on EPA Greenhouse Gas Equivalency Calculator. System lifetime is assumed to be 25 years.